A simulation of the 2012 Olympic games stadium in London where 50 000 people are moving out of the stadium. We can see people moving out of their seat, walking up or down the stairs towards the nearest exit.
This simulation provides information about the time required to empty the entire stadium, counts the number of people that went through strategic and pre-defined areas, allow for stadium surroundings analysis capability and much more…
Importing the stadium 3D model directly into CrowdWays really speeds up the analysis process. Once the 3D model is in the simulation environment, passages, stairs, seats and exits can easily be added to the model to add the pedestrians dynamics and produce the desired outputs.
Based on your analysis requirements, the system measure of performances will be established and the necessary metric tools added to the model directly from the simulation environment allowing for scenario comparisons automatically done by CrowdWays.